Structure
MS structures are fabricated to the surveyed roof, hot-dip or epoxy treated against Karachi's coastal corrosion, and anchored so they survive the pre-monsoon winds that come off the sea every summer.
Electrical work
DC cabling is UV-rated and routed in conduit, not draped across the slab. AC integration into your DB includes proper breakers, SPD protection and a dedicated earth pit — the parts nobody photographs and everybody needs.
Commissioning
We test string voltages, insulation resistance and earth continuity before energising, then walk you through the inverter app, the shutdown procedure and what a normal day's generation curve should look like on your roof.
Key takeaways
- Corrosion-treated MS structure for coastal conditions
- Conduit-routed UV cabling, SPD and dedicated earthing
- Full commissioning tests and a hands-on handover