Eligibility and sizing
Net metering requires a three-phase connection and a system sized within the sanctioned load rules. We check your connection type at survey stage, so nobody discovers a problem after the panels are up.
The filing itself
We prepare the single-line diagram, equipment datasheets, test reports and the application set, submit to K-Electric, and follow the file through inspection and meter installation. You are kept informed at each stage rather than left guessing.
After the meter is installed
We explain how import and export appear on your bill, how credits carry forward, and how to read whether the system is exporting as designed.
Key takeaways
- Complete K-Electric filing handled by us
- Eligibility confirmed at survey stage
- Clear explanation of how your credits work